Floor update

I tried not to laugh at Mr. Optimistic (that's Nic) when we were ripping up our laminate floor and he said he was going to have all the tile done in two weeks. Bless him.

And I'm not going to look at my last post about our torn up floor because I've lost count of the weeks that have gone by and there is seemingly no new tile floor in sight. Sigh.

But we do have wire mesh and cement down on half of our main floor. That's at least some progress right? Right.